Planned highways and transport projects

pride in our community logo

We have 626 miles of road, 743 miles of footpaths, 132 cycle ways, 20,000 street lights, 120 roundabouts, around 400 parks and open spaces and around 15 million trees.

As part of the Council’s 4 year investment programme to Protect, Care and Invest to create a better borough, between 2020 and 2024 we are investing over £50m to keep neighbourhoods safe, clean and well connected. The ‘Pride in Our Community’ programme will deliver improvements to infrastructure including roads, footpaths, parking, sustainable transport, street furniture, drains and structures.

Our highways vision is to ‘Keep Telford Moving’ and in 2020/2021 we will invest £22m to deliver 200 improvement schemes across the borough.

The 12-month programme includes road safety schemes, the creation of more residential parking spaces in local neighbourhoods, road improvements, footpath improvements, drainage works as well as work on highways structures such as bridges.

The latest findings by the Department for Transport show that the condition of our roads are better than the regional and national averages, which is quite an achievement given the current financial challenges we face. We are also ranked 3rd out of 45 unitary authorities for public satisfaction.

Major maintenance schemes in 2020/2021 will include:

  • A41 and A518 Improvements (Newport Innovation Park)
  • A442 Structures - Major Structures repairs to critical bridges at Hollinswood and Stirchley
  • A442 - Brockton Loops resurfacing
  • A442 Northbound – Resurfacing works in vicinity of Randlay Interchange
  • Beverley Roundabout
  • Stafford Park 10 and 6.

In addition the programme of work includes:

  • footway surface treatments - 30,000m2
  • carriageway surface treatments - 95,000m2
  • other resurfacing and patching improvements to roads
  • 9 road safety schemes
  • road marking improvements across the borough
  • residential parking schemes to create another 50+ parking spaces
  • work on major structures, for example; bridges, tunnels, retaining walls, etc.
  • drainage improvements.

These improvements will be delivered in partnership with the Council's new highways contractor Balfour Beatty Living Places.

In addition to planned works, we also carry out reactive maintenance to keep the travelling public safe. We are working with Balfour Beatty to look after our roads, footpaths and infrastructure - visit our YouTube channel to watch the 'keeping Telford and Wrekin Moving' video to find out interesting facts and figures.

Visit our report it section to report highway faults and issues online


Overview of the schemes happening over the next 12 months in each ward

Please note planned delivery dates are shown, however these dates are subject to change due to a number of factors such as weather, coordination with utilities and unforeseen ground conditions.

This table provides an overview of the improvement schemes happening in Admaston and Bratton over the next 12 months.
Type of works  Location Planned delivery date
Footway Patching and Surface Treatments Broomfield Road February 2021
Footway Patching and Surface Treatments The Beeches February 2021
Footway Patching and Surface Treatments Sutton Road February 2021
Footway Patching and Surface Treatments Pemberton Road February 2021
Footway Patching and Surface Treatments Ringers Way February 2021
Footway Patching and Surface Treatments Gilpin Road February 2021
Footway Patching and Surface Treatments Burnell Road February 2021
Drainage Repairs - Flooding to garden Station Road TBC
Drainage Repairs - Footway gully blocked / broken Shawbirch Road On Hold
Road Marking Refreshment Programme Various Complete

This table provides an overview of the improvement schemes happening in Apley Castle over the next 12 months.
Type of works   Location Planned delivery date
Carriageway Surface Dressing - Wappenshall road to Peregrine Way A442 Apley Complete
Footway Patching and Surface Treatments (deferred from 2019/20) Chichester Drive Complete
Footway Patching and Surface Treatments (deferred from 2019/20) Montgomery Mews Complete
Footway Patching and Surface Treatments (deferred from 2019/20) Gloucester Court Complete
Footway Patching and Surface Treatments (deferred from 2019/20) Brandon Grove Complete
Footway Patching and Surface Treatments (deferred from 2019/20) Manchester Drive Complete
Parking Improvements - On street lining Hadley Park Road On Hold
School safety zone, delivered as part of capital programme scheme Apley Wood Primary School Complete
Road Marking Refreshment Programme Various Complete

This table provides an overview of the improvement schemes happening in Arleston over the next 12 months.
Type of works  Location Planned delivery date
Parking Improvements - 12 New Parallel Bays Kingsland Estate Part Complete
Road Marking Refreshment Programme Various Complete

This table provides an overview of the improvement schemes happening in Brookside over the next 12 months.
Type of works  Location Planned delivery date
Carriageway Resurfacing - Section of Road from bridge round the loop back onto A442 Brockton Way (A442 Brockton Loops) Complete
Carriageway Patching and Surface Dressing - entire road Briarwood Complete
Carriageway Patching - various locations Aqueduct Lane Complete
Carriageway Patching and Surface Dressing -  entire road Birchmore Complete
School Safety Zone - delivered as part of road safety scheme Windmill Primary School Complete
Road Marking Refreshment Programme Various Complete

This table provides an overview of the improvement schemes happening in Church Aston and Lilleshall over the next 12 months.
Type of works  Location Planned delivery date
Carriageway Surface Treatment -  Sub station to Edgmond Road                          Longford Road Complete
School Safety Zone - delivered as part of road safety scheme Lilleshall Primary School Complete
Drainage Repairs - Install drainage channel Newtown TBC
Drainage Repairs - Install inspection chamber A41 (near New Lodge Woodcote) Spring 2021
Road Marking Refreshment Programme Various Complete

This table provides an overview of the improvement schemes happening in College over the next 12 months.
Type of works  Location Planned Delivery Date
Carriageway Resurfacing - entire road  Roslyn Road Complete
Footway Patching and Surface Treatments College Lane February 2021
Footway Patching and Surface Treatments Albert Road February 2021
Footway Patching and Surface Treatments Wyke Rise February 2021
Footway Patching and Surface Treatment Roslyn Road February 2021
Footway Patching and Surface Treatment Aston Close February 2021
Footway Patching and Surface Treatment Leegomery Road February 2021
Footway Patching and Surface Treatment Meese Close February 2021
Road Safety Scheme - Collision Reduction Scheme Watling Street / Bennetts Bank January 2021
Road Marking Refreshment Programme Various Complete
Drainage Repairs - Ponding outside properties Regent Street TBC

This table provides an overview of the improvement schemes happening in Dawley and Aqueduct over the next 12 months.
Type of works Location Planned Delivery Date
Carriageway Surface Dressing -  entire road Majestic Way Deferred 2021/2022
Carriageway Patching and Surface Dress - from Finger Road to new development Hinkshay Road Complete
Carriageway Resurfacing - from Holly Road to Parish Close Trinity Road Complete
Footway Patching and Surface Treatments Conroy Drive Complete
Footway Patching and Surface Treatments Willets Way Complete
Footway Patching and Surface Treatments Hoskens Close Complete
Footway Patching and Surface Treatments Walder Close Complete
Parking Improvements - On street lining Majestic Way February 2021
Parking Improvements Pageant Drive March 2021
Parking Improvements Botany Bay close March 2021
Road Safety Scheme - Collision Reduction Scheme Springhill Road/Finger Road January 2021
School Safety Zone Captain Webb Primary School Complete
School Safety Zone within permanent 20mph speed limit, traffic calming, parking restrictions Dawley Church of England Primary School with Nursery Complete
Drainage Repairs - Flooding of private land from highway  Hafren Road Winter 2020
Road Marking Refreshment Programme Various Complete

This table provides an overview of the improvement schemes happening in Donnington over the next 12 months.
Type of works Location Planned Delivery Date
Carriageway Patching and Micro Asphalt -  entire road Queens Road Complete
Carriageway Patching and Micro Asphalt -  entire road School Road Complete
Footway Patching and Surface Treatments School Road Complete
Footway Patching and Surface Treatments The Bungalows Complete
Footway Patching and Surface Treatments Queens Road Complete
Footway Patching and Surface Treatments Ash Road Complete
Footway Patching and Surface Treatments Coronation Drive Complete
Footway Patching and Surface Treatments Wrekin Drive Complete
School Safety Zone, Parking restrictions and parking improvements Donnington Wood Infant School and Nursery Centre Complete
Drainage Repairs - Ponding to carriageway and flooding of private property  Cordingley Way Complete
Road Marking Refreshment Programme Various Complete
Road  Safety Scheme St Matthews School TBC

This table provides an overview of the improvement schemes happening in Dothill over the next 12 months.
Type of works Location Planned Delivery Date
Road Marking Refreshment Programme Various Complete

This table provides an overview of the improvement schemes happening in Edgmond and Ercall Magna over the next 12 months.
Type of works Location Planned Delivery Date
Carriageway Patching -  Sleap Farm and River Lane junction A442 Crudgington Complete
Road Safety Scheme - Collision Reduction Scheme B5062 Tibberton March 2021
Road Safety Scheme - to reduce speeds and improve safety A442 Cold Hatton Complete
School Safety Scheme - traffic calming, VAS signs, gateways St Lawrence Church of England voluntary controlled Primary School Complete
School Safety Zone - delivered as part of road safety scheme High Ercall Primary School Complete
School Safety Zone - bollards, lining, signing Crudgington Primary School Complete
School Safety Zone and safety scheme Tibberton Church of England Primary School Deferred to 2021/2022
Drainage Repairs - Upgrade drainage to prevent flooding to private land Newport Road Complete
Road Marking Refreshment Programme Various Complete
Structures - (359) Ercall Mill Bridge - Retaining wall reconstruction and safety barrier upgrade  B5062 (Roden Lane) Complete

This table provides an overview of the improvement schemes happening in Ercall over the next 12 months.
Type of works Location Planned Delivery Date
School safety Zone Ercall Wood Technology College Complete
Road Marking Refreshment Programme Various Complete

This table provides an overview of the improvement schemes happening in Hadley and Leegomery over the next 12 months.
Type of works Location Planned Delivery Date
Carriageway Patching and Surface Dressing -  entire road Millstream Way Deferred 2021/2022
Road Safety Scheme - Collision Reduction Scheme & HGV movements Trench Lock / Haybridge Road March 2021
Road Safety Scheme - 20mph speed limit, crossing improvements, parking restrictions- delivered through S106 Hadley Learning Centre  Complete
School Safety Zone - delivered as part of road safety scheme Milbrook Primary School Complete
Drainage Repairs - Flooding to underpass Whitchurch Drive January 2021
Road Marking Refreshment Programme Various Complete

This table provides an overview of the improvement schemes happening in Haygate over the next 12 months.
Type of works Location Planned Delivery Date
Carriageway Surface Treatment - entire road Alexandra Road March 2021
Carriageway Surface Treatment - entire road Mansell Road March 2021
Footway Patching and Surface Treatments Wrockwardine Road Complete
Footway Patching and Surface Treatments Spring Hill Complete
Footway Patching and Surface Treatments Lawrence Road Complete
Road Marking Refreshment Programme Various Complete

This table provides an overview of the improvement schemes happening in Horsehay and Lightmoor over the next 12 months.
Type of works Location Planned Delivery Date
Carriageway Resurfacing - A5223 Approach to roundabout (Retexture remainder of Roundabout) Jiggers Bank Roundabout  Complete
Structures - (491) Lawley Common Railway Bridge - Site investigation (Drainage) / Safety barrier upgrade Dawley Road On Hold
Road Safety Scheme - Traffic calming Station Road & Bridge Road, Horsehay January 2021
School Safety Zone - 20mph zone, parking improvements, crossing improvements Lightmoor Primary School March 2021
Road Marking Refreshment Programme Various Complete

This table provides an overview of the improvement schemes happening in Ironbridge Gorge over the next 12 months.
Type of works Location Planned Delivery Date
Carriageway Patching  - In vicinity of Dale End Car Park Buildwas Road March 2021
Carriageway Patching and Surface Dressing - Calcutts Road to Waterloo Street B4373 Ironbridge Road March 2021
Carriageway Patching and surface treatment - from Station Road to Coalbrookdale Iron Works Coach Road March 2021
Carriageway Patching and surface treatment - from Station Road to Coalbrookdale Iron Works Station Road March 2021
Carriageway Surface Dressing - entire road Hillside Complete
Carriageway Resurfacing - from Black Swan Pub to Ironbridge Road junction Lloyds Head - Coalford  Complete
Footway Patching and Surface Treatments Madeley Road March 2021
Footway Patching and Surface Treatments Buildwas Road March 2021
Footway Patching and Surface Treatments Coach Road / Darby Road March 2021
Structures - Church Road Retaining walls - Safety barrier replacement Church Road  February 2021
Structures - Wharfage retaining wall - Major maintenance (Scope of works to be confirmed)  Wharfage  On Hold
Structures - Madeley Road Number8 Retaining Wall - Reconstruction / Replacement Madeley Road  Deferred to 2021
School Safety Zone - parking restrictions Coalbrookdale and Ironbridge Church of England Primary School Complete
Drainage Repairs - Inspection of footpath gully Station Yard Car Park Complete
Drainage Design - Upgrade the shakespeare channel gully Coalport High Street February 2021
Drainage Investigation - Investigate 3 gullies Waterloo Street Complete
Road Marking Refreshment Programme Various Complete

This table provides an overview of the improvement schemes happening in Ketley and Overdale over the next 12 months.
Type of works Location Planned Delivery Date
Carriageway Resurfacing - Entire Interchange and approaches West Centre Way Roundabout Complete
Carriageway Resurfacing - Entire Interchange and section of Road towards Greyhound Interchange Beverley Roundabout Complete
Carriageway Resurfacing - entire road  Damson Drive Complete
Carriageway Resurfacing and joint treatment - various locations Sandbrook Complete
Footway Patching and Surface Treatments Broadway Complete
Structures - Hollinswood Number1 and 3 Bridges - Concrete repairs / safety barrier upgrade / joint replacement  Hollinswood Interchange  Deferred to 2021
Structures - Hollinswood Number1 Retaining Wall (Southbound / Off slip) - Parapet upgrade  Hollinswood Interchange  Deferred to 2021
Structures - Hollinswood Number 2 and 4 Railway Bridges - Bridge joint replacement  Hollinswood Interchange (RAIL) Deferred to 2021
Parking Improvements - 4 New Pull In Bays Prices End Complete
Parking Improvements - 11 New Parallel Bays Riddings Close February 2021
Parking Improvements - 5 New Pull In Bays Western Rise Complete
Road Safety Scheme - to improve network Box Road Part Complete
Road Safety Scheme - Traffic calming Waterloo Road / Road Road Ketley Part Complete
School Safety Zone  Newdale Primary School Complete
Road Marking Refreshment Programme Various Complete

This table provides an overview of the improvement schemes happening in Madeley and Sutton Hill over the next 12 months.
Type of works Location Planned Delivery Date
Carriageway Patching and Surface Dressing -  entire road Stanwyck Deferred 2021/2022
Carriageway Patching and Surface Dressing - Coalport Road to Madeley Roundabout Legges Way Complete
Carriageway Surface Dressing - entire road Great Hay Drive Complete
Carriageway Resurfacing - entire road  South Drive Complete
Carriageway Structural Patching  -  various locations Queen Street February 2021
Parking Improvements - 7 New Pull In Bays Stebbings Complete
School Safety Zone John Fletcher of Madeley Primary School Complete
School Safety Zone Sir Alexander Fleming Primary School Complete
School Safety Zone St Mary's Catholic Primary School Complete
School Safety Zone, Parking improvements John Randall Primary School Complete
School Safety Zone, Signal improvements Madeley Academy Complete
Drainage Design - Flooding on footpath Footpath near Halesfield 21 On Hold
Drainage Repairs - Install manhole A442 On Hold
Drainage Repairs - Install new land and road drainage Coalport Road Complete
Drainage Repairs - Repair root damaged pipe Halesfield 10 On Hold
Road Marking Refreshment Programme Various Complete
Structures - (304) Madeley Number1 Underpass - Safety barrier upgrade B4373 (Parkway) Complete
Structures - (561) Madeley Number2 Footbridge - Footway resurfacing and concrete repairs  Silken Way Footpath (Over Parkway) Complete

This table provides an overview of the improvement schemes happening in Malinslee and Dawley Bank over the next 12 months.
Type of works Location Planned Delivery Date
Carriageway Patching and Surface Dress - from Finger Road to new development Hinkshay Road Complete
Carriageway Patching and Surface Dressing -  entire road Buxton Road Deferred 2021/2022
Carriageway Patching and Surface Dressing -  entire road Eyton Road March 2021
Drainage Repairs - To prevent flooding of private property from footpath Spout Way Complete
Drainage Design - Ponding on footpath to school Spout Lane Complete
School Safety Zone - crossing improvements, parking restrictions Ladygrove Primary School March 2021
School Safety Zone - crossing improvements  The Telford Langley School TBC
Road Marking Refreshment Programme Various Complete

This table provides an overview of the improvement schemes happening in Muxton over the next 12 months.
Type of works Location Planned Delivery Date>
Carriageway Patching - various locations Fieldhouse Drive Complete
School Safety Zone Muxton Primary School Complete
Road Marking Refreshment Programme Various Complete

This table provides an overview of the improvement schemes happening in Newport North and West over the next 12 months.
Type of works  Location Planned Delivery Date
Carriageway Resurfacing - entire road  Boughey Road March 2021
School Safety Scheme - traffic calming, crossing improvements St Peter and St Pauls Complete
Road Marking Refreshment Programme Various Complete

This table provides an overview of the improvement schemes happening in Newport South and East over the next 12 months.
Type of works  Location Planned Delivery Date
Carriageway Resurfacing - entire road  Vineyard Road March 2021
School Safety Zone Newport Infant School Complete
Drainage Repairs - Install footway drainage Stafford Road Complete
Drainage Repairs - Drainage to reduce ponding Meadow Road Complete
Road Marking Refreshment Programme Various Complete

This table provides an overview of the improvement schemes happening in Oakengates and Ketley Bank over the next 12 months.
Type of works  Location Planned Delivery Date
Footway Patching and Surface Treatments Main Road Complete
Footway Patching and Surface Treatments Hartshill Complete 
Footway Patching and Surface Treatments Church Street Complete
Footway Patching and Surface Treatments Charlton Street Complete
Footway Patching and Surface Treatments Vicar Street Complete
Footway Patching and Surface Treatments School Grove Complete
Footway Patching and Surface Treatments Greyhound Hill Complete
Footway Patching and Surface Treatments Weavers Rise Complete
Structures - (239) Russels Footbridge - Safety barrier upgrade A442 (Trench to Wombridge)  February 2021
Road Marking Refreshment Programme Various Complete

This table provides an overview of the improvement schemes happening in Park over the next 12 months.
Type of works  Location Planned Delivery Date
Footway Patching and Surface Treatments Parklands Complete
Footway Patching and Surface Treatments Wrockwardine Road Complete
Footway Patching and Surface Treatments Spring Hill Complete
School Safety Zones - crossing improvements St Patrick's Catholic Primary School & Wrekin View Primary School Complete
Road Marking Refreshment Programme Various Complete

This table provides an overview of the improvement schemes happening in Priorslee over the next 12 months.
Type of works  Location Planned Delivery Date
School Safety Zone Redhill Primary School Complete
School Safety Zone - delivered as part of road safety scheme Priorslee Primary School Complete
Road Marking Refreshment Programme Various Complete
Carriageway Patching - from the bridge to St Georges Road Moss Road Complete

This table provides an overview of the improvement schemes happening in Shawbirch over the next 12 months.
Type of works  Location Planned Delivery Date
Carriageway Surface Treatment - Wappenshall road to Peregrine Way A442 Shawbirch  June 2020
Road Marking Refreshment Programme Various Complete

This table provides an overview of the improvement schemes happening in St Georges over the next 12 months.
Type of works  Location Planned Delivery Date
Carriageway Patching - from the bridge to St Georges Road Moss Road Complete
Carriageway Surface Treatment - entire road Park Close March 2021
Carriageway Patching and Surface Dressing -  entire road Marion’s Hill March 2021
Carriageway Patching and Surface Dressing -  entire road Priorslee Road March 2021
Carriageway Structural Patching  -  various locations Station Hill Complete
Footway Patching and Surface Treatments Church Road Complete
Parking Improvements - 3 New Parallel Bays Canongate On Hold
School Safety Zone - parking improvements, traffic calming, crossing improvements St George's Church of England Primary School March 2021
Drainage Investigation - Investigate flooding to private land Stafford Street Complete
Drainage Repairs - Flooding to highway Priorslee Road Complete
Road Marking Refreshment Programme Various Complete

This table provides an overview of the improvement schemes happening in The Nedge over the next 12 months.
Type of works  Location Planned Delivery Date
Carriageway Reconstruction - Southbound  Slip Road onto Hollinswood Interchange  Hollinswood Interchange  Complete
Carriageway Patching and Resurfacing - A442 and slip road to Randley Interchange A442 Randlay to Stirchley Northbound + Randley SB off Slip Complete
Carriageway Resurfacing -  Stafford Park 11 to junction of Stafford Park 6 Stafford Park 10 Complete
Carriageway Patching and Surface Dressing -  Mill Farm Crescent to Church Way Stirchley Avenue Complete
Carriageway Resurfacing - entire road  Chesterton Complete
Carriageway Patching - various locations Aqueduct Lane Complete
Carriageway Patching - various locations Stafford Park 2 Complete
Footway Patching and Surface Treatments Attingham Close Complete
Footway Patching and Surface Treatments Holmer Lane Complete
Footway Patching and Surface Treatments Wroxeter Way Complete
Footway Patching and Surface Treatments Boscobel Close Complete
Footway Patching and Surface Treatments Deepdale Complete
Structures - Hollinswood Number1 and 3 Bridges - Concrete repairs / safety barrier upgrade / joint replacement  Hollinswood Interchange  Deferred to 2021
Parking Improvements - 2 New Parallel Bays Clover Grove On Hold
School Safety Zone - 20mph speed limit with improvements to crossing facilities and traffic calming Grange Park Primary School February 2021
School Safety Zone Randlay Primary School Complete
School Safety Zone - 20mph speed limit with improvements to crossing facilities and traffic calming.  Delivered alongside Telford Grange School The Telford Park School February 2021
School Safety Zone - delivered as part of road safety scheme Hollinswood Primary and Nursery School Complete
Drainage Repairs - Pooling on footway outside 18 Speedwell Ridge Complete
Drainage Repairs - Root cutting and investigation work Stafford Park 7 Complete
Drainage Repairs - Ponding to footpath and garden Brands Farm Way January 2021
Drainage Repairs - Highway ponding Calcott Complete
Drainage Repairs - Inspection of underpass drainage Stirchley Avenue January 2021
Road Marking Refreshment Programme Various Complete 
Structures - Hollinswood Number 2 and 4 Railway Bridges - Bridge joint replacement  Hollinswood Interchange (RAIL) Deferred to 2021
Structures - Stirchley North and South Bridges - Concrete repairs - safety barrier upgrade  Stirchley Interchange  Deferred to 2021
Structures - (224) Naird Lane Number1 Bridge - Waterproofing / safety barrier upgrade (Joint Highways Scheme) A442 (Randlay to Stirchley)  Complete
School Safety Zone, improved crossing, traffic calming, parking restrictions Holmer Lake Primary School Complete

This table provides an overview of the improvement schemes happening in Woodside over the next 12 months.
Type of works  Location Planned Delivery Date
Carriageway Resurfacing - entire road  Broad Meadow Lane Complete
Carriageway Surface Treatment - various sections Park Lane March 2021
Carriageway Resurfacing - entire road  Woodcroft Complete
Carriageway Resurfacing - entire road  Wayside Complete 
Footway Patching and Surface Treatments Woodside Avenue Complete
Footway Patching and Surface Treatments Park Lane Complete
Structures - (304) Madeley Number1 Underpass - Safety barrier upgrade B4373 (Parkway) Complete
Scholl Safety Zone William Reynolds Primary School March 2021
Drainage Repairs - Upgrade drainage Wellsfield December 2020
Road Marking Refreshment Programme Various Complete

This table provides an overview of the improvement schemes happening in Wrockwardine over the next 12 months.
Type of works  Location Planned Delivery Date
Carriageway Patching - within Longdon on Tern B5063 Shawbirch to Longdon on Tern March 2021
Road Safety Scheme - to reduce speeds Wellington Road/The Wrekin, Little Wenlock Part Complete
Drainage Repairs - Install drainage pipe Burcot Lane March 2021
Road Marking Refreshment Programme Various Complete
Structures - (359) Ercall Mill Bridge - Retaining wall reconstruction and safety barrier upgrade  B5062 (Roden Lane) Complete
Road Safety Zone - 20mph speed limit, crossing improvements, school safety zone Lawley Primary School Complete

This table provides an overview of the improvement schemes happening in Wrockwardine Wood and Trench over the next 12 months.
Type of works  Location Planned Delivery Date
Structures - (239) Russels Footbridge - Safety barrier upgrade A442 (Trench to Wombridge)  February 2021
Carriageway Surface Treatment -  entire road Lineton Close Complete
Carriageway Resurfacing - entire road (except cul de sac) Talbot Road Complete 
Carriageway Surface Treatment - entire road Henley Drive Complete
Carriageway Patching and Surface Treatment -  entire road Marlow Drive Complete
Carriageway Patching and Surface Treatment -  entire road Sunbury Drive Complete
Carriageway Surface Treatment - entire road Garden Close Complete
Carriageway Resurfacing - entire road  Charles Street Complete
Parking Improvements - 2 New Pull In Bays Wade Road Complete
Parking Improvements - Investigation Works Bridge Road Complete
Drainage Repairs - Upgrade road gullies Gibbons Road On Hold
Road Marking Refreshment Programme Various Complete

Last updated: 21/12/2020 15:45

  1. Projects - 2020/2021
  2. Projects - 2019/2020
  3. Contact