Planned highways and transport projects

pride in our community logo

We have 626 miles of road, 743 miles of footpaths, 132 cycle ways, 20,000 street lights, 120 roundabouts, around 400 parks and open spaces and around 15 million trees.

As part of the Council’s 4 year investment programme to Protect, Care and Invest to create a better borough, between 2020 and 2024 we are investing over £50m to keep neighbourhoods safe, clean and well connected. The ‘Pride in Our Community’ programme will deliver improvements to infrastructure including roads, footpaths, parking, sustainable transport, street furniture, drains and structures.

Our highways vision is to ‘Keep Telford Moving’ and in 2021/2022 we will invest £21.6m to deliver over 160 improvement schemes across the borough.

The 12-month programme includes road safety schemes, the creation of more residential parking spaces in local neighbourhoods, road improvements, footpath improvements, drainage works as well as work on highways structures such as bridges.

The latest findings by the Department for Transport show that the condition of our roads are better than the regional and national averages, which is quite an achievement given the current financial challenges we face.

This £21.6m investment will be invested as follows:

  • £7.635m into roads and footpaths
  • £1.2m into Structures
  • £1.15m into drainage and council owned assets
  • £0.671m into street furniture, lighting and lines
  • £2.583m into sustainable transport, parking and safety schemes
  • £8.355m into major projects.

These improvements will be delivered in partnership with the Council's new highways contractor Balfour Beatty Living Places.

In addition to planned works, we also carry out reactive maintenance to keep the travelling public safe. We are working with Balfour Beatty to look after our roads, footpaths and infrastructure, visit our YouTube channel to watch the 'keeping Telford and Wrekin Moving' video to find out interesting facts and figures.

Visit our report it section to report highway faults and issues online


Overview of the schemes happening over the next 12 months in each ward

Please note: planned delivery dates are shown, however these dates are subject to change due to a number of factors such as weather, coordination with utilities and unforeseen ground conditions.

This table provides an overview of the improvement schemes happening in Admaston and Bratton over the next 12 months.
Type of works  Location Planned delivery date

Surface Treatments

Donnerville Gardens To be confirmed
Surface Treatments Shawbirch Road (Service Road) To be confirmed

This table provides an overview of the improvement schemes happening in Apley Castle over the next 12 months.
Type of works   Location Planned delivery date
Road Restraint Upgrade (RRS) A442 (adjacent Hoo Farm Roundabout) To be confirmed

This table provides an overview of the improvement schemes happening in Arleston over the next 12 months.
Type of works  Location Planned delivery date
Preventative Arleston Avenue To be confirmed
Resurface Bayley Road Phase 2 To be confirmed
Resurface High View To be confirmed
Resurface Princess Avenue (Side Road) To be confirmed

This table provides an overview of the improvement schemes happening in Brookside over the next 12 months.
Type of works  Location Planned delivery date
Resurfacing/Surface Treatment All of Brookside To be confirmed
Essential maintence A442 (Brockton Lopp) To be confirmed
Major Works A442 Hollinswood to Castlefields To be confirmed
Major Works A442 Hollinswood to Castlefields To be confirmed

This table provides an overview of the improvement schemes happening in College over the next 12 months.
Type of works  Location Planned delivery date
Syrface Treatment Fairfield Court To be confirmed
Resurfacing Beacon and Market Street Both Sides To be confirmed
Surface Treatment Victoria Avenue and Railway Station To be confirmed

This table provides an overview of the improvement schemes happening in Dawley and Aqueduct over the next 12 months.
Type of works  Location Planned delivery date
Resurface Webb Crescent To be confirmed
Resurface Manor Road To be confirmed
Resurface Heath Hill Roundabout To be confirmed
Surface Treatment Aqueduct Road To be confirmed
Surface Treatment Bridgnorth Road To be confirmed
Surface Treatment Cooke Drive To be confirmed
Surface Treatment Beames Close To be confirmed
Surface Treatment Ivatt Close To be confirmed
Surface Treatment Morton Court To be confirmed
Residential Parking Improvements Pageant Drive To be confirmed

This table provides an overview of the improvement schemes happening in Donnington over the next 12 months.
Type of works  Location Planned delivery date
Resurface Wrekin Drive - Cul De Sac To be confirmed
Resurface Hawthorn Road To be confirmed
Surface Treatment Ewart Road To be confirmed
Surface Treatment Ash Road To be confirmed
Surface Treatment Farm Lane Bungalows To be confirmed
Traffic Calming Donnington To be confirmed
Residential Parking Improvements Celadine Way To be confirmed

This table provides an overview of the improvement schemes happening in Edgmond and Ercall Magna over the next 12 months.
Type of works  Location Planned delivery date
Resurface A442/B5062 Junction - Crudgington To be confirmed
Surface Treatment Pinfold Croft To be confirmed
Patch and Joint Seal A41 To be confirmed
Junction Improvement Stamford Bridge and Chester Road Junction To be confirmed

This table provides an overview of the improvement schemes happening in Ercall over the next 12 months.
Type of works  Location Planned delivery date
Traffic Calming Holyhead Road and Ercall Lane To be confirmed
Traffic Calming Haygate Road Near Bowring Park To be confirmed

This table provides an overview of the improvement schemes happening in Hadley and Leegomery over the next 12 months.
Type of works  Location Planned delivery date
Preventative Gladstone Street To be confirmed
Preventative Grovefields To be confirmed
Preventative Manor Road To be confirmed
Preventative Hurleybrook Way To be confirmed

This table provides an overview of the improvement schemes happening in Haygate over the next 12 months.
Type of works  Location Planned delivery date
Surface Treatments Alexandra Road To be confirmed
Surface Treatments Rose Crescent To be confirmed
Residential Parking Improvements Simon Close To be confirmed

This table provides an overview of the improvement schemes happening in Horsehay and Lightmoor over the next 12 months.
Type of works  Location Planned delivery date
Resurface Lawley Common Roundabout To be confirmed
Surface Treatments Old Office Road To be confirmed

This table provides an overview of the improvement schemes happening in Ironbridge Gorge over the next 12 months.
Type of works  Location Planned delivery date
Surface Treatments Jiggers Bank To be confirmed
Patching Darby Road To be confirmed
Traffic Claming Jiggers Bank To be confirmed
Reconstruction Various To be confirmed

This table provides an overview of the improvement schemes happening in Ketley and Overdale over the next 12 months.
Type of works  Location Planned delivery date
Resurface    
Surface Treatments Red Lees To be confirmed
Surface Treatments Marlborough Way - Estate To be confirmed
Surface Treatments Park Lane To be confirmed
Surface Treatments The Crest To be confirmed
Surface Treatments Old Coppice Grange To be confirmed
Surface Treatments The Rock To be confirmed
Surface Treatments Mannerley Lane To be confirmed
Surface Treatments Hartley Close To be confirmed
Surface Treatments Laurel Lane Cul De Sac To be confirmed
Surface Treatments Mount Side To be confirmed
Surface Treatments Ivy House Paddocks Estate - Including Low Valley Close To be confirmed
Surface Treatments Garfield Road To be confirmed
Networks Improvement Colliers Way To be confirmed
Traffic Claming Lawley Drive To be confirmed
Residential Parking Improvements Princes End Drive Near 61 To be confirmed

This table provides an overview of the improvement schemes happening in Madeley and Sutton Hill over the next 12 months.
Type of works  Location Planned delivery date
Surface Treatments High Street To be confirmed
Surface Treatments Southfield To be confirmed
Resurfacing/Surface Treatments All of Sutton Hill To be confirmed
Residential Parking Improvement Sutton Way To be confirmed

This table provides an overview of the improvement schemes happening in Madeley and Sutton Hill over the next 12 months.
Type of works  Location Planned delivery date
Resurface Powis Place To be confirmed
Surface Treatments Princes Charles Crescent To be confirmed
Surface Treatments Dovedale Fold To be confirmed
Surface Treatments Dawley Bank To be confirmed
Surface Treatments Dark Lane To be confirmed
Surface Treatments Alma Avenue To be confirmed
Residential Parking Improvements Melbourne Close, Dawley To be confirmed

This table provides an overview of the improvement schemes happening in Muxton over the next 12 months.
Type of works  Location Planned delivery date
Resurface New Trench Road - A518 To be confirmed
Surface Treatments Columbine Way To be confirmed

This table provides an overview of the improvement schemes happening in Newport North and West over the next 12 months.
Type of works  Location Planned delivery date
Resurface Heathwood Road To be confirmed
Resurface Greenacres Way To be confirmed
Surface Treatments Broomfield Road/Broomfield Place To be confirmed

This table provides an overview of the improvement schemes happening in Newport South and East over the next 12 months.
Type of works  Location Planned delivery date
Surface Treatment Tudor Close To be confirmed
Surface Treatment Harcourt Drive To be confirmed

This table provides an overview of the improvement schemes happening in Oakengates and Ketley Bank over the next 12 months.
Type of works  Location Planned delivery date
Resurface Lincoln Road Area To be confirmed
Resurface Vicar Street To be confirmed
Resurface Charlton Street To be confirmed
Resurface Church Street To be confirmed
Resurface The Woodlands To be confirmed
Surface Treatments Hawthorne Close To be confirmed
Surface Treatments Station Approach To be confirmed
Residential Parking Improvements First Avenue To be confirmed

This table provides an overview of the improvement schemes happening in Park over the next 12 months.
Type of works  Location Planned delivery date
Surface Treatment Admaston Road To be confirmed

This table provides an overview of the improvement schemes happening in Shawbirch over the next 12 months.
Type of works  Location Planned delivery date
Surface Treatment Span Meadow To be confirmed
Surface Treatment Oakfield Road To be confirmed

This table provides an overview of the improvement schemes happening in St Georges over the next 12 months.
Type of works  Location Planned delivery date
Preventative West Street To be confirmed
Surface Treatment Hollybirch Grove/Dorran Place To be confirmed

This table provides an overview of the improvement schemes happening in The Nedge over the next 12 months.
Type of works  Location Planned delivery date
Essential Maintenance Hollinswood Interchange To be confirmed
Essential Maintenance Hollinswood Interchange To be confirmed
Road Restraint Upgrade - RRS Hollinswood Interchange To be confirmed
Major Works Hollinswood Interchange To be confirmed
Major Works A442 Hollinswood to Castlefields To be confirmed
Major Works A442 Hollinswood to Castlefields To be confirmed
Resurface Dallamoor, Hollinswood  
Preventative Dalelands, Hollinswood  
Preventative Dunsheath  
Preventative Deepdale  
Resurface A5 Telford Way  
Resurface Stafford Park 18  
Resurface Randlay Interchange North Bound Off Slip  
Patching Hollinswood Interchange  
Residential Parking Improvements Daywell  
Major Works Randlay Interchange  
Major Works Stirchley Interchange  

This table provides an overview of the improvement schemes happening in Wrockwardine Wood and Trench over the next 12 months.
Type of works  Location Planned delivery date
Structural Patching A442 Trench Lock to Wombridge Interhchange To be confirmed
Surface Treatment Tudor Meadow To be confirmed
Surface Treatment Wrockwardine Wood Way To be confirmed
Patching Gibbons Road To be confirmed
Traffic Calming Trench Road and Wombridge Road To be confirmed
Residential Parking Improvements Johnstone Close To be confirmed

Last updated: 11/02/2021 10:03